Created and Edited by Thomas Pitre,B.F.A., MA, Ph.D. - Sequim, WA. Pitre is a 1987 graduate of The Institute on Thinking, Critical and Creative, Harvard Graduate School of Education, Cambridge. Certificate: Creativity, Innovation, and Change MOOC. University of Pennsylvania. Sept., 2013. Certificate: Design Thinking Action Lab, MOOC July 2013. Stanford University. Continued study, Penn State, MIT, and Stanford in Design and Creativity, 2014
Monday, September 30, 2013
Monday, September 23, 2013
Subject: Applied Engineering
Subject: Applied Engineering
[Creativity, Innovation and Change]
Thank you to Scott from Oregon for this story.
------------------------------------------------------------
A toothpaste factory had a problem: they sometimes shipped empty boxes, without the tube inside. This was due to the way the production line was set up, and people with experience in designing production lines will tell you how difficult it is to have everything happen with timings so precise that every single unit coming out of it is perfect 100% of the time. Small variations in the environment (which can’t be controlled in a cost-effective fashion) mean you must have quality assurance checks smartly distributed across the line so that customers all the way down to the supermarket don’t get upset and buy another product instead.
Understanding how important that was, the CEO of the toothpaste factory got the top people in the company together and they decided to start a new project, in which they would hire an external engineering company to solve their empty boxes problem, as their engineering department was already too stretched to take on any extra effort.
The project followed the usual process: budget and project sponsor allocated, RFP, third-parties selected, and six months (and $8 million) later they had a fantastic solution — on time, on budget, high quality and everyone in the project had a great time. They solved the problem by using high-tech precision scales that would sound a bell and flash lights whenever a toothpaste box would weigh less than it should. The line would stop, and someone had to walk over and yank the defective box out of it, pressing another button when done to re-start the line.
A while later, the CEO decides to have a look at the ROI of the project: amazing results! No empty boxes ever shipped out of the factory after the scales were put in place. Very few customer complaints, and they were gaining market share. “That’s some money well spent!” – he says, before looking closely at the other statistics in the report.
It turns out, the number of defects picked up by the scales was 0 after three weeks of production use. It should’ve been picking up at least a dozen a day, so maybe there was something wrong with the report. He filed a bug against it, and after some investigation, the engineers came back saying the report was actually correct. The scales really weren't picking up any defects, because all boxes that got to that point in the conveyor belt were good.
Puzzled, the CEO travels down to the factory, and walks up to the part of the line where the precision scales were installed.
A few feet before the scale, there was a $20 desk fan, blowing the empty boxes off the belt and into a bin.
--
Friday, September 20, 2013
Thursday, September 19, 2013
Monday, September 16, 2013
Monday, September 9, 2013
Richard Turere: My invention that made peace with lions | Video on TED.com
This young man is beautiful, and I wish him all the best.